Project Pool
Home Shop Maintenance Waxman Tiles Enclosures Case Studies
  Home » Case Studies » Replacement Liner
Replacement Liner


Drained the Pool

Here we are draining the water from the pool to expose the old damaged liner.
This size pool was drained out in three stages to prevent any structural damage.


Click to Enlarge

Click to Enlarge



Cleaned, Checked the Pool and Removed Fittings

After draining the pool the shell is completely cleaned out and checked for damage.
Then all the fittings are removed and the roman end (steps) are blanked off with a board


Click to Enlarge

Click to Enlarge



Clipped the Liner In

The liner is then moved into the clean pool and we start to clip the liner into the track running around the top of the pool underneath the coping stones.


Click to Enlarge



Vacuumed the Liner and Replaced Fittings

Once the liner is securely fitted in to the liner track we then suck the liner to the walls and floor using a vacuum. Once the liner is nice and tight and in place we then start to massage the liner to get out any creases. The pool is then ready to be filled up with fresh water after we replace all the fittings (skimmer, main drain and inlets)


Click to Enlarge

Click to Enlarge



Job Well Done!

Once the pool is full of fresh water the filtration system is switched on and we can then remove the board that was blocking off the roman end. The water is then chemically balanced and the job is complete.


Click to Enlarge

Click to Enlarge



The new liner shown in the pictures is a Marble with a Mosaic Tile Band